The published figures put a typical outdoor kitchen at 15,000 and 35,000, with a basic kitchen at 8,000 and 15,000 and a custom build at 25,000 to 50,000. This
The published figures put a typical outdoor kitchen at 15,000 and 35,000, with a basic kitchen at 8,000 and 15,000 and a custom build at 25,000 to 50,000. This guide shows what sits behind those numbers, what each counter-run material costs per linear foot and how long it lasts, what the installed add-ons run, and how to read an itemised quote line by line. This site is a free matching service — we do not build outdoor kitchens.
| Build | Published range |
|---|---|
| Typical outdoor kitchen project | 15,000 and 35,000 |
| Basic kitchen — built-in grill and modest countertops | 8,000 and 15,000 |
| Custom build — pergola, refrigeration, cabinetry, sink and outdoor fireplace | 25,000 to 50,000 |
| Full kitchen-and-pergola package | 30,000 and 50,000 |
| Outdoor fireplace, by size and stone | 12,000 to 40,000 |
| Adding a pergola (including lighting, ceiling fans or retractable covers) | 4,000 to 12,000 |
Across the whole category, published budgets run from $5K for basic grill setups to $75K+ for full luxury kitchens with pergolas, pizza ovens, and bars. Those are installed prices, not material prices, and where your job lands inside them is decided by appliances, countertop material, and utility runs — the big-ticket items. Cost varies with project size, materials, site conditions, and the specific requirements of your property, so a band is a starting point for the conversation rather than a quote.
| Material / system | Rate | Lifespan | Annual maintenance | Re-seal interval |
|---|---|---|---|---|
| Masonry block island with stucco finish | $250-450/lf | 25 yrs | 150 | 3 yrs |
| Stone veneer masonry with granite counter | $400-670/lf | 30 yrs | 200 | 4 yrs |
| Modular stainless cabinets with stone top | $350-700/lf | 20 yrs | 80 | 0 |
| Framed island with poured concrete counter | $200-350/lf | 15 yrs | 250 | 2 yrs |
| Kitchen under a pergola or patio cover | $450-900/lf | 25 yrs | 220 | 3 yrs |
| Bar-height counter run only (no appliances) | $180-320/lf | 20 yrs | 120 | 2 yrs |
The published model defaults to a 12 lf counter run, and the tool notes describe the trade-offs in the same file: masonry and stucco gives the widest finish choices and needs re-sealing every few years; stone veneer is the premium look but is heavy, so footings and thickness matter; modular stainless is fast to install and can be reconfigured later; a framed island with a poured concrete counter is the cheapest permanent route and its counter needs sealing more often; a kitchen under a cover adds shade and all-weather use with the structure cost separate.
Read the first and fifth rows together: a covered counter run costs more per linear foot than the same run in the open, because the cover is being priced into it.
| Add-on (installed) | Range |
|---|---|
| Built-in gas grill | 1,500 – 5,000 |
| Pizza oven | 1,000 – 8,000 |
| Outdoor-rated refrigerator | 800 – 3,500 |
| Sink with plumbing | 300 – 2,000 |
| Gas line run from the meter | 400 – 2,000 |
| Low-voltage lighting package | 500 – 1,500 |
Those are installed figures rather than appliance prices, and they sit on top of the counter run. That stacking is why two quotes for the same layout can differ by 30 to 40 percent while both are honest — appliance brands and stone selection are the two variables, and weather-rated grills and refrigerators carry a 30 to 50 percent premium over indoor models.
| Item | Published figure |
|---|---|
| Modest outdoor kitchen with grill, counter and storage | 10,000 to 20,000 |
| Full build with sink, fridge, pizza oven and stone counters | 20,000 and 50,000 |
| Checklist budget instruction, depending on appliances, stone, and utilities | 10,000 to 50,000 |
| Built-in grill | 2,000 to 8,000 |
| Grill station with a small counter | 2,000 to 5,000 |
| Sink with running water | 1,500 to 3,500 |
| Outdoor-rated refrigerator | 1,000 to 3,000 |
| Pizza ovens and rotisseries | 1,500 to 6,000 |
| Stone counters, and granite or quartzite installed outdoors | 60 to 120 per square foot |
| Running gas, water and electric lines | 2,000 to 5,000 |
| Underground line runs and trenching | 500 to 2,000 |
| Wood pergola | 3,000 to 8,000 |
| Aluminum or steel structure with louvers | 8,000 to 20,000 |
| Permit allowance | 75 – 400 |
Where a band here differs from the headline ranges above, both are quoted as published from their own model rather than blended into a single number.
From a signed agreement to completion is typically two and six weeks, and most builds run four to eight weeks with the average around five weeks. Measured from permit to finish it is four to ten weeks, and custom stone and special-order grills can stretch the timeline to twelve weeks.
The published step durations are 3-7 days for design, layout and appliance selection; 10-25 days for HOA approval and permits; 2-3 days for utility rough-in; 3-6 days for the masonry or cabinet build; 7-14 days for countertop template and fabrication, described as the quiet week in the schedule; 1-2 days for appliance set, cover and commissioning; and 1 day for the final walk-through and handover.
The published warranty terms are workmanship 1-3 years, structure and masonry 5-10 years, countertop 1-10 years and appliances 1-5 years manufacturer, and most contracts exclude freeze damage, UV fading of the counter sealant, and damage from uncovered appliances. Ask which exclusions apply to your build.
The site-wide published range for a typical project is 15,000 and 35,000. A basic kitchen with a built-in grill and modest countertops runs 8,000 and 15,000; a custom build with pergola, refrigeration, cabinetry, sink and outdoor fireplace runs 25,000 to 50,000; and a full kitchen-and-pergola package runs 30,000 and 50,000. An outdoor fireplace alone is 12,000 to 40,000 and adding a pergola typically adds 4,000 to 12,000.
Appliances, countertop material, and utility runs are the big-ticket items, and prices vary by 30 to 40 percent for the same layout based on appliance brands and stone selection. Where a quote is higher because of scope rather than margin, it is usually one of these: a written utility plan with gas line sizing, electrical circuit capacity and water shutoff locations; trenching, which adds 500 to 2,000 and which many quotes leave out; running gas, water and electric lines at 2,000 to 5,000; the 4-inch reinforced concrete slab on compacted gravel a masonry build needs; or a cover, which is priced separately from the counter run.
Yes, and the published comparison rows price it: a grill station is grill and counters at 3,000–8,000 built in 1–2 weeks, against a full outdoor kitchen at 15,000–40,000 over 4–8 weeks. A grill station with a small counter is published separately at 2,000 to 5,000 as the cheaper alternative to a full kitchen.
It does, and the cover is the item most often left out of a first quote. Adding a pergola typically adds 4,000 to 12,000 including lighting, ceiling fans or retractable covers, and a full kitchen-and-pergola package lands at 30,000 and 50,000. A kitchen under a pergola or patio cover is priced at $450-900/lf against $200-350/lf for a framed island with a poured concrete counter. A cover also changes what is possible: covered or enclosed areas require a rated vent hood, and an under-counter grill or enclosed room without airflow traps smoke and heat and damages finishes.
The base and the utility plan, because neither can be added cheaply later. A 4-inch reinforced concrete slab on compacted gravel is the standard base for masonry and stone builds, the slab should slope away from the structure and include a floor drain if it has a sink or ice maker, and gas lines, electrical circuits, and water lines must be permitted and inspected for safety. Then decide on a cover early, because it affects the layout as well as the cost. Homeowners who build under cover consistently say ventilation and prep space are the two things they'd never skip.
A permit allowance of 75 – 400 is published for the work. Gas line work, new electrical circuits and any covered structure usually need a permit, HOA approval is separate, and the inspection sequence on a covered structure runs a gas pressure test, an electrical rough-in and a final inspection. The providers you're matched with handle permitting as part of the project.